Completed projects
- Bełchatów ring-road
Soil stabilisation with the EPO-GRUNT binder from Bełchatów Power Plant over an 11 km-long road section.
Contractor: BUDIMEX S.A. Deliveries: June 2015 – autumn 2016
Volume supplied: approx. 25,000 Mg of EPO-GRUNT binder.
- S-7 dual carriageway section between Chęciny – Jędrzejów, approximate length: 21 km
Production of stabilised mixes with the use of fly ash from Bełchatów Power Plant.
Contractor: Leader SALINI POLSKA;
Sub-contractor for 1st section: BUDAR Sp. z o.o.
Volume supplied to BUDAR until August 2016: approx. 5,000 Mg
- A1 motorway construction, section Stryków – Tuszyn, phase II
Soil stabilisation with fly ash from Bełchatów Power Plant over an 11 km-long road section near Łódź.
Contractor: MOTA-ENGIL CENTRAL EUROPE S.A.
Deliveries: October 2014 – May 2016
Volume supplied: approx. 18,000 Mg of calcareous fly ash.
- Investment at Kluczbork Forest Inspectorate in 2015
Use of light EPO broken aggregate from boiler slag to harden forest roads within the area under the administration of the Forest Inspectorate in Kluczbork. Contractor: “KBJT” Company.
- Investment at Lubliniec Forest Inspectorate in 2015. In total, 2869 km of forest roads built.
The contractor used a technology of mixing dolomite, basalt and EPO aggregate to make a permeable and well-compacted and durable surface. Contractor: “KBJT” Company.
- Erection of embankments and building of a square in front of a CGI office building at Wrocławska street in Opole in 2015
Use of light EPO broken aggregate from boiler slag to erect embankments and square in front of a CGI office building at Wrocławska street in Opole. Contractor: BIL Sp. z o.o.
- A1 motorway construction, section Stryków – Tuszyn, phase III
Soil stabilisation with fly ash from Bełchatów Power Plant over a 16 km-long road section near Łódź.
Contractor: Consortium of BUDIMEX S.A. (leader) and STRABAG Sp. z o.o.
Deliveries: October 2014 – June 2015
Volume supplied: over 50,000 Mg of calcareous fly ash.
- Macro-levelling of an investment area – Szczecin, Stołczyńska street
Use of ash and slag mixture from Dolna Odra Power Plant
Land owner: Business Development Support Fund – Fundusz Wspierania Rozwoju Gospodarczego Miasta Szczecina Sp. z o.o.
Deliveries: June 2014 – June 2015
Volume supplied: approx. 200,000 Mg (dry mass).
- Land levelling at wood processing plant in Chudoba, near Opole
Use of EPO aggregate made of boiler slag.
Land owner: ZPUH Export-Import Marek Pietrek.
Deliveries: October 2014 – March 2015
Volume supplied: approx. 8,000 Mg (in total approx. 45,000 Mg in the years 2010-2015).
- Investment at Olesno Forest Inspectorate in 2014. In total, 2780 m of forest roads built.
15 cm thick base course made of EPO, surface made of dolomite, limestone, basalt and EPO aggregate mixture. This technology made it possible to achieve a permeable and well-compacted and durable surface.
Contractor: “KBJT” Company.
- Construction of S8 express: S8 Syców – Kępno – Wieruszów- Walichnowy
Soil stabilisation with fly ash from Bełchatów Power Plant over a 12 km-long road section near Łódź,.
Contractor: MOTA-ENGIL CENTRAL EUROPE S.A.
Deliveries: March 2013 – June 2014
Volume supplied: approx. 14,000 Mg of calcareous fly ash.
- Rebuilding of Wspólna street in Opole
Road works with the use of EPO aggregate made of boiler slag
Deliveries: April 2014 – May 2014.
Volume supplied: approx. 3,000 Mg
- National road DK 46 Schodnia – Dębska Kuźnia – Lędziny
Use of EPO-BET road mix – national road repair.
- Provincial road DW 414 Dzików – Smolarnia
Use of EPO-BET road mix – national road repair.
- Reclamation – PGE GiEK S.A. Turów lignite open-pit mine (municipality of Bogatynia)
Excavation type: depleted lignite open cast, area: 70 ha
Land reclamation purpose: agricultural – arable land
Type of waste used: 10 01 82 mixtures of fly ash and solid waste from calcium-based flue gas desulphurisation (dry and semi-dry methods of flue gas desulphurisation and fluidized bed combustion)
Land reclamation period: 1999 – 2014.
Volume supplied: 18,5 million Mg
- Construction of a traffic hub for a northern Opole ring-road
Embankments made with EPO aggregate made of boiler slag.
Contractor: SKANSKA S.A.
Deliveries: May 2013 – November 2013
Volume supplied: approx. 44,000 Mg
- Reclamation – CERPOL-KOZŁOWICE Sp. z o.o. (municipality of Gorzów Śląski)
Excavation type: depleted clay pit, area: 11.1 ha
Land reclamation purpose: agricultural – arable land
Type of waste used: 10 01 01 slag, ash and boiler dust; 10 01 02 coal fly ash.
Land reclamation period: 2012 – 2022
Estimated volume to be supplied: 4 million Mg.
- Land reclamation – Rock Raw-materials Company – Przedsiębiorstwo Surowców Skalnych BAZALT-GRACZE Sp. z o.o. (municipality of Niemodlin)
Excavation type: depleted basalt pit, area: 41.5 ha
Land reclamation purpose: agricultural – arable land
Type of waste used: 10 01 01 slag, ash and boiler dust; 10 01 02 coal fly ash
Land reclamation period: 2006 – approx. 2033
Estimated volume to be supplied: 22 million Mg.