Operation of a milling plant and storage area at Bełchatów Power Plant (PGE GiEK S.A.)

 

  • operation of a limestone milling facility, including auxiliary equipment,
  • operation (within unit 858 MW) of a limestone meal storage area, including sorbent production and feeding,
  • operation (within unit 858 MW) of a gypsum storage area, including gypsum scraping, transport and loading,
  • operation of the gypsum storage area and feeders transporting gypsum to Knauf Bełchatów Sp. z o.o.
  • operation of limestone storage area, limestone transport equipment and limestone feeding to mill silos.
Design & Implementation: Komunikator PR